Issue 31671 - Generating a chart with data sources of 300+ rows uses 100% CPU and takes a long time to complete
Summary: Generating a chart with data sources of 300+ rows uses 100% CPU and takes a ...
Status: CLOSED DUPLICATE of issue 16280
Alias: None
Product: General
Classification: Code
Component: chart (show other issues)
Version: 3.3.0 or older (OOo)
Hardware: All Linux, all
: P3 Trivial (vote)
Target Milestone: ---
Assignee: kla
QA Contact: issues@graphics
URL:
Keywords:
Depends on:
Blocks:
 
Reported: 2004-07-18 17:22 UTC by bootsy52
Modified: 2013-02-24 21:19 UTC (History)
1 user (show)

See Also:
Issue Type: TASK
Latest Confirmation in: ---
Developer Difficulty: ---


Attachments

Note You need to log in before you can comment on or make changes to this issue.
Description bootsy52 2004-07-18 17:22:27 UTC
Hi,

according to a friend it is no problem if you got a data selection of 300 or
more rows (3 columns). To generate a chart from this selection. However we've
used the same sheet in OpenOffice.org 1.1.2 and tried to generate a chart from
this. This takes many times longer than in Excel and my CPU usage raises up to
100 %.

I'm getting this on a PIII 900Mhz Machine with 512MB Ram on Linux using kernel
2.6.7 and Java-1.4.2-03
Comment 1 kla 2004-08-11 14:32:20 UTC
duplicate

*** This issue has been marked as a duplicate of 16280 ***
Comment 2 kla 2004-08-11 14:32:52 UTC
closed as duplicate