Issue 81337 - charting a curve XY graph
Summary: charting a curve XY graph
Status: CLOSED IRREPRODUCIBLE
Alias: None
Product: General
Classification: Code
Component: chart (show other issues)
Version: 3.3.0 or older (OOo)
Hardware: PC All
: P3 Trivial (vote)
Target Milestone: ---
Assignee: kla
QA Contact: issues@graphics
URL:
Keywords:
Depends on:
Blocks:
 
Reported: 2007-09-07 03:37 UTC by sobelle00
Modified: 2013-02-24 21:20 UTC (History)
1 user (show)

See Also:
Issue Type: FEATURE
Latest Confirmation in: ---
Developer Difficulty: ---


Attachments
XY curve graph-need point labels (25.98 KB, text/plain)
2007-09-07 03:39 UTC, sobelle00
no flags Details
XY curve graph-need point labels (25.98 KB, text/plain)
2007-09-07 03:39 UTC, sobelle00
no flags Details

Note You need to log in before you can comment on or make changes to this issue.
Description sobelle00 2007-09-07 03:37:18 UTC
I don't know if I selected the correct items above but, I downloaded your 
software to help me in an Economics class.  My assignment was to plot a curve 
graph.  I used your X-Y axes and after clicking several buttons, it worked.  My 
problem, I needed to label each point on the chart.  I tried clicking on the 
text box and the letter would always stick itself in the middle of the graph.  
I never could get it moved to one of the points.  How do I do this?  Thanks
Comment 1 sobelle00 2007-09-07 03:39:14 UTC
Created attachment 48027 [details]
XY curve graph-need point labels
Comment 2 sobelle00 2007-09-07 03:39:21 UTC
Created attachment 48028 [details]
XY curve graph-need point labels
Comment 3 bjoern.milcke 2007-09-07 08:00:29 UTC
There are two modes for charts, activated and not activated. You seem to have chosen to edit the text of 
the inactive chart, which is just one text box in the middle. I am not quite sure what you really want. There 
are three possibilities: 1. you want to modify the properties of data labels, then you have to activate the 
chart by double-click, 2. you want to move the labels arond: you have to wait for OOo 2.4, 3. you want to 
add some additional text: you should add some text objects and move them over the inactive chart or 
copy them to the clipboard and paste them into the active chart (where they can no longer be modified).
Comment 4 kla 2007-09-21 10:59:20 UTC
@sobelle00: I think it would be nice to answer the Questions from BM. Match one
of the three solutions?
Comment 5 kla 2007-09-28 12:32:22 UTC
NO response from submitter, so i think i can close this issue.
Comment 6 kla 2007-09-28 12:32:50 UTC
closed